VALE , Malaysian Iron Ore Port Project 2010 to 2014 , Lumut.

 

 

Materials handling system design and engineering from concept through to completion of the project in 2014 100MT per annum Iron Import/Export Port

Material – Iron Ore

Design Capacity:

  • 100 MTpA Import /Export Distribution Terminal
  • 10 000tph on 1800mm wide belting

System Features:

  • 3 Ship unloaders at 4500 tph
  • 1 Ship loader at 10 000 tph
  • 3 Bucket wheel Stacker/Reclaimers 10 000 tph
  • Conveyor system including yard, import/export elevated conveyor with moving heads
  • Operational Readiness

Contract Type: Design and Engineering with site supervision