VALE , Malaysian Iron Ore Port Project 2010 to 2014 , Lumut.
Materials handling system design and engineering from concept through to completion of the project in 2014 100MT per annum Iron Import/Export Port
Material – Iron Ore
Design Capacity:
- 100 MTpA Import /Export Distribution Terminal
- 10 000tph on 1800mm wide belting
System Features:
- 3 Ship unloaders at 4500 tph
- 1 Ship loader at 10 000 tph
- 3 Bucket wheel Stacker/Reclaimers 10 000 tph
- Conveyor system including yard, import/export elevated conveyor with moving heads
- Operational Readiness
Contract Type: Design and Engineering with site supervision