Eskom Matla Power Station, RSA, 2005 Ash Handling Plant Design Audit
The Fly Ash, Coarse Ash and Ash water Return Systems for a 6 by 600 MW Power Station.
- Time and Motion Studies.
- Design Review of Plant and Components.
- Plant Performance Testing.
- Mass and Water Balances.
- Simulation Modelling of the Processes.
- CAPEX and OPEX Cost Analysis.
- Preparation of PFD’s.
Contract Type – Design Study
Contact – Andries Wiid
Tel. – +27 83 556 0699