Letseng Diamond Mine, Tailings Disposal System, Maluti Mountains (Altitude 3000m), 2008

 

 

Material – Diamond Tailings

Capacity – 700 tph (900 mm Belt Width)

System Features:

  • 1,5km Overland Conveyor with Fixed Tripper and Multiple Discharge Points.
  • 1km long Tail -Driven Downhill Extendable Conveyors (2 off) with Rail -Mounted Tripper and 18m Boom Spreader.
  • Ambient Operating Temperatures +35°C to -20°C.
  • Transfer Houses (3 off).

Contract Type – Design, Engineering, Procurement, Erection and Commissioning.