Letseng Diamond Mine, Tailings Disposal System, Maluti Mountains (Altitude 3000m), 2008
Material – Diamond Tailings
Capacity – 700 tph (900 mm Belt Width)
System Features:
- 1,5km Overland Conveyor with Fixed Tripper and Multiple Discharge Points.
- 1km long Tail -Driven Downhill Extendable Conveyors (2 off) with Rail -Mounted Tripper and 18m Boom Spreader.
- Ambient Operating Temperatures +35°C to -20°C.
- Transfer Houses (3 off).
Contract Type – Design, Engineering, Procurement, Erection and Commissioning.